Common problem |
Cause |
Solution |
The middle part of the compound bubbles |
Add dry oil when brushing |
Dry and then recombine |
The amount of glue is too small |
Increase glue |
|
Film or print surface contamination or excessive dusting |
Dedusting |
|
The overflow on the surface of the rubber roller is not removed, causing the mucous membrane to empty |
Cleaning glue roller |
|
The pressure is too small, and the air in the glue is not completely eliminated during the film |
Increase roll |
|
The surface of the film is polluted, and the moisture is not enough when the water-based glue is applied |
Film changing
|
|
Concave and convex husking |
The amount of adhesive film is too small, and the adhesive layer will creep |
Change the glue |
The amount of film is too large, the glue becomes brittle, and falls off after impact |
Change the glue |
|
The film cutter has burrs or deep indentation |
Trimming tool |
|
The adhesive layer is not fully cured or the ink is not dry. The recombination time is too close to the indentation |
Extended placement time |
|
The composite has uneven crimp |
Excessive film tension, excessive tension during production, post-slitting stress |
Tone down |
Retraction |
Reverse flat film product |
|
The composite changes color after mounting |
Laminating glue is strongly alkaline |
Change the tile glue |
Moisture absorption during mounting leads to chemical reaction discoloration, which leads to falling off in serious cases |
Change the tile glue |
|
The ink is placed for a long time, and the antioxidants fail |
Get a new ink |
|
Composite printing gold color |
The copper powder content is too high |
Reduce the amount of glue, can not be solved then change the dry film glue |
Copper powder surface treatment is not good |
||
After compound generally how much time rolling concave and convex is good |
Composite fastness, in addition to the glue itself, and paper, printed matter, ink, the degree of dryness of the weather and many other factors, in the summer generally three hours after rolling, and in winter, it takes 12 hours to do, in addition should be determined by the specific situation of the composite. |
Copyright © 2015-2025 Anhui Sinograce Chemical Co., Ltd..All Rights Reserved.powered by dyyseo.com
top